Yorktown Victory Center Outdoor Interpretive Area
![Yorktown Victory Center Stormwater Drainage](https://hsbllc.com/wp-content/uploads/Victory_2.jpg)
Drainage Improvements Phase II & III
![James Terrace Erosion Control](https://hsbllc.com/wp-content/uploads/Terrace_1.jpg)
Reshape and regrade existing stream and install rock features and retaining wall. This project won first place for the 2017 best BMP Retrofit. > Learn about this award
Neighbors Drive Improvements
![Neighbors Drive Erosion Control](https://hsbllc.com/wp-content/uploads/Neighbors_2.jpg)
The work under this Project consists of demolition within the existing area including tree removal and utility connections; construction of new paved roads with curb and gutter; new sidewalk; new multiuse asphalt trail; new street signs; new water and sewer connections; water and sewer extensions and relocations; new stormwater management collection system and treatment facility […]